Experience | Efficiency | Expertise

Case Studies (Use your up/down arrow keys to scroll the case studies)


Insurance

Jameson Court, Moreton-in-Marsh

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Jameson Court, Moreton-in-Marsh
Refurbishment of existing two-storey supported housing property
£32,000
8 weeks
Bromford Supported Housing

Read more >

Insurance

Gloucester City Museum

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Gloucester City Museum
Installation of special needs lift
£30,000
6 weeks
Gloucester City Council

Read more >

Insurance

Kingshill School Cirencester

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Kingshill School Cirencester
New-build flat roof extension
£200,000
16 weeks
Gloucestershire County Council

Read more >

Insurance

House of Fraser, Cwmbran

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
House of Fraser, Cwmbran
Repair works to building
£85,000
14 weeks
House of Fraser PLC

Read more >

Insurance

Morrisons Stratford-upon-Avon

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Morrisons Stratford-upon-Avon
Construction of new above ground sprinkler pumphouse
£181,000
16 weeks
Morrisons Supermarkets PLC

Read more >

Insurance

Argos

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Argos
Refurbishment of the staff canteen areas, plus store redecoration
£30,000
20 weeks
Argos - part of the home retail group

Read more >

Insurance

Covingham, Swindon, Wilts

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Covingham, Swindon, Wilts
Major internal strip-out and complete re-instatement following extensive flood damage
£27,000
12 weeks
Crawford & Co - Loss Adjusters

Read more >

Insurance

Iron Acton, South Gloucestershire

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Iron Acton, South Gloucestershire
Emergency temporary covering to fire-damaged property
£15,000
Within 2 hours emergency work
Crawford & Co - Major Incident Team

Read more >

Insurance

Tower House, Pittville Circus, Cheltenham

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Tower House, Pittville Circus, Cheltenham
Refurbishment works to two large flats in a converted Grade II listed building in the heart of Cheltenha...
£36,000
9 weeks
Asprea - Part of Carilion Plc

Read more >

Insurance

Prince Albert Estate Laundry Room, Bedford Street, Glouceste...

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Prince Albert Estate Laundry Room, Bedford Street, Glouceste...
Refurbishment of existing laundry room
£3,200
2 weeks
Gloucestershire Housing Association

Read more >

Insurance

32 Burford Road, Witney

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
32 Burford Road, Witney
Installation of new bathroom and kitchen facilities
£26,000
6 weeks
Advance Housing Association

Read more >

Insurance

Rooftop Housing Association

Project:
Scope of Work:

Contract Sum:
Contract Duration:
Client:
Rooftop Housing Association
Provision of level access showers and full bathroom refurbishments
£500,000
5 years
Rooftop Housing Association

Read more >

Case Studies View all >

Jameson Court, Moreton-in-Marsh

Jameson Court, Moreton-in-Marsh


The aim of this project was to provide suitable access for special needs clients by adapting an existing two-storey house. This included levelling entrances for wheel chair access, installing level access showers and a stair lift to access the bedrooms. We also adapted the kitche...
Read More >
Case Studies View all >

Gloucester City Museum

Gloucester City Museum


Our brief was to install a fully accessible special needs lift from the ground floor to the first floor mezzanine levels. Working while the museum was still open to the public, we removed an existing timber floor to allow the lift to be installed against the mezzanine structure. ...
Read More >
Case Studies View all >

Kingshill School Cirencester

Kingshill School Cirencester


By building a flat roof extension on top of existing Special Education Needs (SEN) classrooms, we provided four new individual teaching rooms. We also carried out internal alterations to provide a wheel chair-accessible shower room, fitted out with Hoist that moves the user onto ...
Read More >
Case Studies View all >

House of Fraser, Cwmbran

House of Fraser, Cwmbran


We carried out extensive repair works to this department store, making sure we completed the project in time for the opening of the precinct for the Christmas period. Works included taking down and rebuilding an existing parapet where water was seeping into the sales area on the ...
Read More >
Case Studies View all >

Morrisons Stratford-upon-Avon

Morrisons Stratford-upon-Avon


At the location of the existing underground pump and control room, we dismantled redundant pipeworks and constructed a new pumphouse. This involved excavating to locate an existing underground water storage tank and constructing heavy reinforced concrete foundations to facilitate...
Read More >
Case Studies View all >

Argos

Argos


Our brief was to carry out kitchen refurbishment and decoration work to Argos stores in Oxford, Worcester and Hereford. This included the removal and safe disposal of existing kitchen fitments. We then supplied and fitted new kitchen units, worktops and other kitchen items, carry...
Read More >
Case Studies View all >

Covingham, Swindon, Wilts

Covingham, Swindon, Wilts


This property in Swindon was flooded during the 2007 floods in the county. The entire ground floor of the property was under two feet of water for approximately 24 hours causing considerable damage to internal finishes. We attended the property when restorers had removed possessi...
Read More >
Case Studies View all >

Iron Acton, South Gloucestershire

Iron Acton, South Gloucestershire


The rural property in Gloucestershire was severely damaged by a fire in the roof. We attended under emergency instructions to temporarily cover the property to protect the internal structure and finishes. A number of our emergency engineers were mobilised along with an Incident M...
Read More >
Case Studies View all >

Tower House, Pittville Circus, Cheltenham

Tower House, Pittville Circus, Cheltenham


Following a water leak in this listed property, we removed and replaced a large lath and plaster ceiling along with its ornate plaster cornice and ceiling decoration. The work was carried out using traditional lime putty mortars, oak laths and completed using traditional methods ...
Read More >
Case Studies View all >

Prince Albert Estate Laundry Room, Bedford Street, Gloucester

Prince Albert Estate Laundry Room, Bedford Street, Gloucester


As part of an annual £500,000 contract with Gloucestershire Housing Association to carry out reactive repairs and void works, we transformed the old laundry room at this housing estate. Works included removing old tiles, re-plastering walls, the installation of a new kitchen and...
Read More >
Case Studies View all >

32 Burford Road, Witney

32 Burford Road, Witney


This particular project was part of an annual £200,000 contract to undertake repairs and void works for Advance Housing Association which provides accommodation for adults with learning and physical difficulties. Our brief was to refurbish an existing occupied building to provid...
Read More >
Case Studies View all >

Rooftop Housing Association

Rooftop Housing Association


We completed a programme of bathroom refurbishment for Rooftop Housing over the course of five years from 2003-2008. During this period, we converted 125 bathrooms to special needs bathrooms, replacing baths with level access showers, and fitting special needs sanitary ware. We a...
Read More >